Product

Eliminate fragmented, manual workflows. Generate evidence.

Critical Infrastructure Protection (CIP)

Inverter-Based-Resources (IBR)

Manage NERC-registered Category 2 non-bulk electric system (BES) IBRs as the applicable standards scale.

CIP Low Impact

Build your fundamentals. Track your cyber assets. Document your policies. Control access. Generate evidence as your team works.

CIP Medium Impact

A comprehensive platform tailored to NERC CIP, making the transition to Medium Impact manageable. Controls, automations and tracking off-the-shelf.

Operations & Planning (O&P)

Facility Interconnection Requirements (FAC)

Requirements mapped to documentation and evidence. Periodic reviews and testing schedules tracked automatically.

Protection and Control (PRC)

Requirements mapped to documentation and evidence. Periodic reviews and testing schedules tracked automatically.

30%

Time Saved

200+

Library Controls

100%

CIP coverage

© 2025 Raptor Maps, Inc.

444 Somerville Ave.

Somerville, MA 02143

Company

© 2025 Raptor Maps, Inc.

444 Somerville Ave.

Somerville, MA 02143

Company

© 2025 Raptor Maps, Inc.

444 Somerville Ave.

Somerville, MA 02143

Company

© 2025 Raptor Maps, Inc.

444 Somerville Ave.

Somerville, MA 02143

Company